Investors
Select Year: 2008 | 2007 | 2006

Company news

02/06/2008

TelecityGroup opens new Powergate data centre in London

Telecity Group plc ('TelecityGroup' or the 'Group'), the leading pan-European operator of network independent data centres, announces that its new state of the art Powergate data centre in London has opened for business.

This new facility, the first to open in central London for several years, is at the forefront of data centre innovation. It will offer approximately 5,000 square metres and 10 megawatts (MW) of customer capacity. The new data centre has been designed to provide 4 kilowatts (kW) of customer power per rack as standard, more than twice the current industry average, with high powered zones offering up to 20 kW per rack. Energy-efficient design principles have been used throughout the building utilising technologies such as free air cooling and sophisticated ‘intelligent’ climate control systems to reduce energy waste. In addition, multiple connectivity options available on site are enhanced by the presence of the London Internet Exchange, LINX, which will offer customers a high level of national and international peering and connectivity to the internet.

Adriaan Oosthoek, Managing Director, TelecityGroup UK and Ireland says: “Our new Powergate data centre offers a highly resilient, connected and secure hosting environment supported by some of the most sophisticated data centre technology available. It is ideally placed for businesses who want to locate their mission critical infrastructure in a London-based facility, while offering enough distance from the Docklands and City to be used for disaster recovery purposes. We are delighted the data centre is now open for business and we have already received a substantial level of customer interest in the facility.”

The Powergate launch follows the opening of the new Amstel Business Park facility in Amsterdam, announced on 7th April 2008, bringing the total number of TelecityGroup data centres in Europe to 20. TelecityGroup recently announced plans to build a new data centre in Paris, its third in the French capital, which is expected to open in the second half of 2009.

Mike Tobin, CEO of TelecityGroup, comments: ”Customers are increasingly seeking large and resilient data centres to provide secure hosting and connectivity services. The buoyancy and continued growth of the internet economy, and the evolving online needs of business both locally and internationally, are combining to drive the increase in demand for high-quality data centres.

“Opening Powergate demonstrates that TelecityGroup has the capability both to build and to operate industry-leading data centres to the highest standard. Coupled with the opening of Amstel Business Park, these new content and connectivity hubs keep us very much at the forefront of the network independent data centre services market in Europe.”



Date   Headline
05/08/2008 Fender picks TelecityGroup to amplify business continuity
31/07/2008 TelecityGroup continues to develop environmentally-sustainable business by becoming the first data centre to take up EDF’s «Equilibre+” offer
31/07/2008 TelecityGroup continue à agir pour le développement durable et devient le premier datacenter à souscrire à l’offre Certificats Equilibre+ d’EDF
30/07/2008 Telecity Group plc Results for the six months to 30 June 2008
30/07/2008 TelecityGroup announces new data centre in Milan
29/07/2008 TelecityGroup partners with AOL
29/07/2008 Skalierbare Rechenzentren der TelecityGroup bilden das Rückgrat der Hochgeschwindigkeits-Netzwerke und –Services von AOL in Deutschland
03/07/2008 3D ‘weather maps’ to increase data centre energy efficiency at TelecityGroup
17/06/2008 SUPINFO outsources IT hosting to TelecityGroup
17/06/2008 TelecityGroup héberge le système informatique de SUPINFO
02/06/2008 TelecityGroup opens new Powergate data centre in London
30/05/2008 TelecityGroup awarded 'Business Growth of the Year' at East London Chamber of Commerce Business Awards
15/05/2008 TelecityGroup announces new €48 million data centre build in Paris
15/05/2008 TelecityGroup annonce la construction d’un nouveau centre de données à Paris pour un montant de 48 millions d’euros
15/05/2008 Telecity Group Plc - Interim Management Statement
14/05/2008 LINX expands London presence with TelecityGroup
16/04/2008 Mike Tobin named 'Outstanding Leader in Data Centres' for second year running
16/04/2008 Mike Tobin nominato per il secondo anno consecutivo 'Outstanding Leader in Data Centres'
15/04/2008 MirriAd selects TelecityGroup to host video advertising technology
09/04/2008 TelecityGroup short-listed in Data Centres Europe Awards
07/04/2008 TelecityGroup opens Amsterdam data centre
28/03/2008 TelecityGroup awarded ‘IPO of the Year' at UK Technology Innovation and Growth Awards
10/03/2008 CSC Computer Sciences B.V. tekent contract met TelecityGroup Nederland
10/03/2008 Computer Sciences Corporation signs as first customer in new TelecityGroup Amsterdam facility
10/03/2008 Telecity Group plc announces Preliminary Results for the Year Ended 31 December 2007
18/02/2008 TelecityGroup shortlisted in two categories at the UK Technology Innovation and Growth Awards
15/02/2008 TelecityGroup recognised in 2008 Fast Growth Business Awards
04/02/2008 Think London chooses TelecityGroup for business continuity
22/01/2008 ARAG Rechtsbijstand selects TelecityGroup to support business continuity plans
22/01/2008 Continue dienstverlening ARAG Rechtsbijstand dankzij TelecityGroup
16/01/2008 VeCommerce bets on TelecityGroup to support launch of new service
09/01/2008 TelecityGroup héberge les données de Yacast sur ses deux site parisiens
09/01/2008 Yacast extends relationship with TelecityGroup